    How To Avoid These 5 Agile Planning Mistakes

    Agile planning is a critical phase of the agile process, as it determines the team’s priorities and sets the tone for the work to come. The planning process helps agile software development and other product development teams sort through new information, adapt to roadblocks, and address evolving customer needs.

    Agile is an iterative process that helps teams reduce waste and maximize efficiency for the ultimate goal of bringing value to customers. This customer-first approach helps teams make informed choices throughout the development process — choices that continually and consistently provide value to stakeholders.

    It’s the opposite of traditional project planning, which takes a step-by-step waterfall approach. For many years, the method dominated project planning with detailed plans laid out at the beginning of a project that had to be adhered to rigidly. This may move a project or product forward, but it neglects to account for any new developments that could occur outside of the “master plan.”

    And what about stakeholders? The best part of the agile process is that stakeholders can be brought in at every turn. You don’t need to guess whether or not you’re making the right decisions — you can find out every step of the way by directly including stakeholders in your process. You can adapt your plan as you need to based on what will provide the most value to customers at any time.

    Yet, even if you are part of a seasoned agile team, there are still hiccups to overcome and processes to finetune. This post will outline some unproductive agile planning mistakes teams make, including how agile teams can avoid these common pitfalls.

    Agile Planning Mistake #1: Not being on the same page as stakeholders

    Do you involve stakeholders in your planning process? Do they understand your goals and why you are making each decision? Working directly with stakeholders will help you gain a clear view of what your customers need and want to determine what should be done when.

    Never assume you’re on the same page as your stakeholders. They live in a different world than the one you are deeply embedded in, and they may not have the same experience with the agile process, your planning methods, or the agile tools your team uses.

    Ensure you never make commitments the team can’t keep. What you thought would provide the most value during the planning phase could be completely different a couple of weeks later.

    In order to produce deliverables that meet stakeholder expectations, you need to agree on what those expectations are. Involve your stakeholders in planning, but ensure everyone understands that expectations could evolve throughout the process based on new information gained from successes, failures, and customer responses.

    Agile Planning Mistake #2: Using bland, flat product maps

    Flat product backlogs are bland and boring 😴. Think carrot cake without icing. They lack the detail and functionality needed to realize the full story of your product backlog.

    Plus, once you have more than a handful of items, they become overwhelming and difficult to organize in a meaningful way. It becomes less clear which item is the most important and more difficult to ensure your decisions align with the larger goal of the project.

    When you plan out your roadmap, it needs context, and you must be able to clearly see the customer journey. User story maps visualize the customer journey in the planning process and throughout the entire process of product development. They utilize user stories — the smallest unit of work that can bring value to the customer — so you can plan and organize the backlog from the customer’s perspective.

    📕 Read our ultimate guide to user story maps to learn more.

    Easy Agile TeamRhythm transforms your flat product backlog into an impactful visual tool. Product owners and team members can plan core user activities, manage epics inside the story map, order user stories by priority, and edit story summaries — all while integrating directly with your Jira agile boards.

    Agile Planning Mistake #3: Not allowing the plan to live, breathe, and adapt

    Agile methodology is an iterative approach. This means your agile planning needs to leave room for changes. Your plan should be able to grow and adapt as you progress with each sprint or product roadmap.

    At the beginning of a sprint, you lack the information needed to see the full picture. You don’t have everything you need to build the perfect solution, and that’s okay. It’s all part of the process. Spending hours or days trying to iron out the perfect plan just wastes time that could be better spent learning and solving problems as they come.

    You may need to alter your plan after a roadblock comes up in a daily stand-up, or you may learn about a customer concern that completely changes your direction. Iterations are inevitable and welcomed! They help you keep pace with incoming information as you learn from each other, stakeholders, and your customers.

    Agile planning isn’t a promise. It’s an outline that will help you reach your goal, and that changes with your goals and circumstances.

    Agile Planning Mistake #4: Not incorporating retrospective insights in the following planning session

    Retrospectives are an essential piece of the agile process. They give teams a chance to reflect on everything that occurred in an individual sprint or after the completion of a product.

    An effective retrospective asks the entire team key questions that can improve the process next time around. What went well? What’s worth repeating again? What didn’t go so well? What could be improved upon next time? What roadblocks or dependencies developed? What did you learn? How did you feel at the end of the sprint?

    A retrospective provides insights that will improve efficiency, teamwork and team dynamics, the effectiveness of tools, and communication with stakeholders.

    Simply holding a retrospective or collecting retrospective feedback is not enough to gain value. You need to ensure you’re incorporating the feedback into the following sprint planning meeting. The next iteration will be all the better for the time you spend reflecting and improving based upon what you learned.

    Agile Planning Mistake #5: Choosing tools that don’t take a customer-centric approach

    Whether your team uses a Scrum process, kanban boards, or agile methods, the tools you choose should always be customer-focused. And you need to continue using them in a way that keeps the customer at the forefront of decision making.

    Teams can fall into a trap believing they’re focusing on the customer when they aren’t doing much of anything beyond following simple agile methods and generic processes. Customers need to be embedded in your development process right from the planning phase so that every decision a team member makes considers customer needs first.

    Choose planning tools that help your entire team get to the heart of what makes your customers tick, and always check in to ensure you are making decisions in line with your customers.

    For example, Personas provide a deep understanding of what customers want, need, don’t want, etc. They reveal key information about customer pain points, desires, demographics, goals, shopping patterns, and much more. We highly suggest developing customer Personas to get a rich picture of all the people who will use your product, but it’s not enough to just have Personas lying around.

    You need to bring these Personas into your agile planning process and keep them front and center as you complete issues and continue to develop your product.

    Easy Agile Personas for Jira helps you create and store Personas within Jira, so you can plan based on customer needs in real-time. The tool will help you empathize with customers in order to make decisions that provide the most value to users at any moment. All of our Easy Agile Jira plugins are customer-focused and designed to keep the customer top-of-mind throughout the product development process.

    Learn more on the Easy Agile blog

    There’s plenty more where this came from. Easy Agile is dedicated to helping teams work better using agile. We make simple, collaborative, customer-focused plugins for Jira.

    We regularly publish lists of tools, advice articles, and how-to guides for agile teams. If you work with Jira, you’ll find our resources are especially helpful in navigating the ins and outs of product development and the Jira plugins that will improve the way your team collaborates.

  • Agile Best Practice

    How to Get the Most From the 4 Key Agile Meetings

    We’re off to the races! 🏃🏃‍♀️ Sprints are a key component of agile methodology. A sprint is a predefined time period in which agile teams work together towards an agreed-upon sprint goal. There are four types of agile meetings that occur over the course of a sprint, and each is vital to ensuring the success of the agile process. It’s all about sprinting through a predetermined amount of work to get to the finish line, where you learn from your process and begin the race again (only better off because of what you learned during the previous sprint).

    Agile meetings are used to get team members, leaders, and stakeholders on the same page, and they guide the process of an agile sprint or Scrum.

    This post will cover the four key agile meetings, which include sprint planning, daily standups, sprint reviews, and sprint retrospectives. Plus, we’ll discuss a bonus agile meeting that’s utilized for backlog refinement.

    Agile meetings vs. Scrum meetings

    Scrum is an agile methodology that’s most commonly used in software development. Scrum meetings are technically a type of agile meeting, but they have more specific parameters designed to fit within the Scrum framework. The process revolves around a 2-4 week sprint involving a product owner, Scrum Master, and the entire Scrum team.

    We covered Scrum meetings (ceremonies) in detail in another article. For the purposes of this post, we’ll focus on the four main agile meeting types. These processes and best practices can be applied across multiple agile methodologies, including Scrum and Kanban. This framework can also be applied across industries beyond software development and can adapt to the needs of most teams.

    Simply put: Scrum has a more rigid framework that follows four ceremonies/meetings. The agile process is much the same, with four very similar meetings, but there’s more flexibility to adjust the time frame of the sprint and adapt the process when not following Scrum guidelines specifically. Okay, maybe that’s still not simply put, but it wouldn’t be agile if it was linear and straightforward.

    The 4 types of agile meetings

    There are four central agile meetings: sprint planning, daily standups, sprint reviews, and sprint retrospective meetings. A sprint starts with a sprint planning meeting. Each day, a daily standup meeting is held. Finally, at the end of the sprint, a sprint review and retrospective are held. The process repeats with new springs until the product, project, or work is complete.

    1. Sprint planning meeting

    The sprint planning meeting occurs at the beginning of a sprint and involves the entire team. In sprint planning, the entire team meets to discuss and agree upon which work tasks (backlog items) should be moved to the sprint backlog — the items that need to be completed by the end of the sprint. During the meeting, sprint goals are determined, and the team aligns on expectations.

    Without a sprint planning meeting to outline the sprint backlog (tasks that need to be completed), the team will waste time during the sprint trying to determine which work takes precedent.

    Sprint planning mistakes to avoid:

    • Starting planning without a refined backlog
    • Not being on the same page as your stakeholders
    • Ignoring the customer and the customer journey when making plans
    • Creating a rigid plan that doesn’t have room to grow or adapt
    • Using bland, flat product maps that lack critical context
    • Failing to incorporate retrospective insights in the following planning session

    Learn more about common agile planning mistakes and how your development team can avoid these pitfalls.

    2. Daily standup meeting

    The daily standup meeting occurs every day of the sprint. In the Scrum process, this meeting might also be called the daily Scrum meeting. It’s a chance for the team to connect about the work that was completed the previous day and what each person or team plans to complete over the course of the next 24 hours.

    The meeting aims to answer three important questions:

    • What work was completed since the last standup to help the team reach the sprint goal?
    • What work do you plan to complete today?
    • Is there anything currently in your way or hindering your progress?

    This is a good time to address any bottlenecks. If work planned from the previous day wasn’t completed, what caused the delay, and how can the team work together to solve any problems keeping the work from moving forward?

    A standup meeting is short and to the point so everyone can get back to the work they hope to complete. So short that it’s often recommended participants stand for the duration of the meeting. Hence the name daily standup. It includes all team members and ideally takes place at the same time every day to ensure everyone can always attend.

    Daily standup mistakes to avoid:

    • Not keeping track of the time during the meeting
    • Continually going over the allotted meeting time
    • Rambling participants who aren’t prepared to answer the meeting’s key questions
    • Skipping the meeting due to lack of time
    • Team members showing up late to the meeting or missing it altogether
    • Allowing the loudest voices to overshadow the rest of the team
    • Letting someone state the same task on multiple consecutive days
    • Failing to address potential bottlenecks
    • Assigning work beyond a person's capacity

    3. Sprint review meeting

    The sprint review is an opportunity for the team to showcase the work they accomplished during the sprint. This meeting might be an internal presentation or a more formal demo to stakeholders, depending on the needs of the project and how far along work is.

    Sprint review mistakes to avoid:

    • Not properly preparing for the meeting or demonstration
    • Not bringing stakeholders in on your process
    • Failing to demonstrate how the work brings value to the customer
    • Exaggerating or embellishing successes
    • Failing to address any problems and how they were solved
    • Not incorporating sprint review feedback into the next sprint planning meeting

    4. Sprint retrospective meeting

    The retrospective is a crucial part of the agile process. The meeting comes at the end of the sprint, bringing the entire team together to assess their processes and discuss how they can improve next time.

    Which aspects of the sprint went well, and what can you learn from that success? What didn’t go so well, and what bottlenecks did the team hit? What could be done better next time? Since agile is all about learning and iterating, there are lessons to be learned after each sprint. Everything from the good to the bad to the mediocre can be transformed into actionable improvements.

    Retrospective mistakes to avoid:

    • Blaming individual team members for bottlenecks
    • Allowing only the loudest voices to provide insight
    • Failing to empower the softer voices in the room
    • Repeating the same questions over and over without changing things up
    • Allowing the retrospective to run too long (aim for two hours for a two-week sprint)
    • Skipping a retrospective due to a lack of time or resources
    • Forgetting about or not including stakeholder insights or needs
    • Failing to improve upon the sprint retrospective process (retrospective the retrospective!)
    • Failing to incorporate retrospective insights in the next sprint

    Bonus: Backlog refinement meeting

    It could be argued that there’s a fifth agile meeting, especially in the product development world. Before the sprint planning meeting, the product owner must create a product backlog, which comprises all of the tasks and items the team needs to complete in order to fully develop the end product or project. The items include user stories, bug fixes, features, and other tasks that must be addressed to achieve the end goal.

    Backlog refinement prepares the backlog for sprint planning by ordering items to deliver the most impact over the next sprint. During backlog refinement, a product owner ensures that product backlog items contain enough information, detail, and prioritization for the team to make smart decisions about what to tackle when.

    A meeting to refine the backlog may occur before sprint planning begins, depending on the current state of the product backlog. Outside of the product development industry, the product backlog might be akin to a master project task list.

    Backlog refinement meeting mistakes to avoid:

    • Not completing backlog refinement in time for sprint planning
    • Leaving too much backlog refinement for the planning meeting
    • Failing to prioritize items that provide customer value
    • Not incorporating new stakeholder feedback, questions, and concerns

    Agile meetings: Final review

    So there you have it! The four key agile meetings are sprint planning, daily standups, sprint reviews, and sprint retrospectives, with an honorable mention going out to backlog refinement.

    Let’s review each meeting’s purpose:

    • Sprint planning gets everyone on the same page about what needs to be accomplished over the course of the coming sprint.
    • Daily standups ensure the team stays on track and helps them address and resolve any potential bottlenecks.
    • Sprint reviews are an opportunity for the team to showcase the work accomplished during the sprint to stakeholders and receive critical feedback.
    • Sprint retrospectives allow the team to come together to discuss what went well, what didn’t go well, and how they can improve next time.
    • Backlog refinement prepares the backlog for sprint planning in order to deliver the most impact over the next sprint.

    Hold effective agile meetings with Easy Agile

    Easy Agile is committed to helping teams work better with agile. Easy Agile builds products specifically designed for Jira users to help agile teams work more efficiently and effectively.

    We regularly publish lists of tools, advice articles, and how-to guides for agile teams. If you work with Jira, you’ll find our resources are especially helpful in navigating the ins and outs of product development and the Jira apps that will improve the way your team collaborates.

  • Agile Best Practice

    Agile Ceremonies: Your Ultimate Guide To the Four Stages

    This guide looks at the four ceremonies that bring one of Agile’s most popular frameworks, Scrum, to life.

    Learn how each agile ritual helps empower teams and drive performance while highlighting some tips to help your organization get the most from your ceremonies.

    At a glance:

    • The four agile ceremonies are Sprint Planning, Daily Stand-Up, Sprint Review and Sprint Retrospective
    • Ceremonies in agile facilitate visibility, transparency, and collaboration.
    • Each ceremony has a clear structure and objective.
    • Clear communication, flexibility, and cultural alignment are the keys to successful ceremonies.

    What are the main agile ceremonies?

    Agile ceremonies refer to the four events that occur during a Scrum sprint. Other forms of agile development, such as Kanban and Lean, also have similar practices.

    The agile ceremonies list includes:

    1. Sprint Planning
    2. Daily Stand-Up
    3. Sprint Review
    4. Sprint Retrospective

    While each ceremony is different, they facilitate the same overall purpose. The ceremonies bring teams together with a common goal under a regular rhythm, and they help teams get things done.

    "With today's enterprises under increased pressure to respond quickly to the needs of their customers and stakeholders, they must bring new products to market faster and accelerate improvements to existing solutions and services." - State of Agile Report

    Why are agile ceremonies important?

    Agile ceremonies help organizations adapt to change and succeed. With work planned in smaller portions and over shorter timeframes, they help teams quickly shift direction and course-correct when needed. They form a key part of the broader agile approach that’s now widely adopted in organizations worldwide.

    With agile ceremonies, teams in your organization can benefit from:

    • Enhanced ability to manage changing priorities
    • Acceleration of software development
    • Increase in team productivity
    • Improved business and IT alignment

    It’s important to remember that while ceremonies are an essential part of Scrum, they’re just one of many rituals that help create agile teams and workplaces. To realize the true benefits of agile, you’ll need to do more than include one or more of the ceremonies into your waterfall project.

    1. Sprint Planning

    The Sprint Planning ceremony sets teams up for success by ensuring everyone understands the sprint goals and how to achieve them.

    StructureAttendeesTimingDurationAgile FrameworkThe Product Owner brings the product backlog to discuss with the Development Team. The Scrum Master facilitates.   Together, the Scrum Team does effort or story point estimations.   The product backlog must contain all the details necessary for estimation. The Product Owner should be able to clarify any doubts regarding the product backlog. The entire Scrum Team (the Development Team, Scrum Master, and Product Owner)At the beginning of each sprintOne to two hours per week of iteration. So, if you're planning a two-week sprint, your Sprint Planning should last two to four hours. Scrum. Although Kanban teams also plan, they do it less formally and per milestone, not iteration.

    Outcomes

    After some team negotiation and discussion, you should have a clear decision on the work that the Development Team can complete during the sprint by the end of Sprint Planning. This is known as the sprint goal.

    The sprint goal is an increment of complete work, and everyone should feel confident about the commitment.

    The product backlog defines priorities that affect the order of work. Then, the Scrum Master transforms that decision into the sprint backlog.

    Top tips

    • Focus on collaboration rather than competition.
    • Break user stories into tasks to get things more operational for the Development Team. If there's time, assign those tasks during the event.
    • Factor in public holidays and any team member’s time off or vacations.
    • Keep your team’s pace in mind – a track record of the time it took to implement similar user stories would be helpful.
    • Focus on the product backlog and nothing else in terms of work for the sprint.

    2. Daily Stand-Up

    The daily stand-up brings the team together and sets everyone up for the day. The team uses this time to identify blockers and share plans for the day.

    StructureAttendeesTimingDurationAgile frameworkThis is an informal, standing meeting. All members of the Development Team inform everyone about what they did the day before and what they’re doing today. Members discuss any blockages they have and ask for help from the team if required.   Due to time restrictions, the updates should be brief.Development Team, Scrum Master, Product Owner (optional) Daily, usually in the morningShort and sharp. No longer than 15 minutesScrum and Kanban

    Outcomes

    The Scrum Master should clear all the blockages that slow down or prevent the Development Team from delivering. As a result, the development process might need to change.

    This daily pulse check keeps the team in sync and helps build trust. Together, the group finds ways to support and help each other.

    Top tips

    • Use a timer to keep this meeting to 15 minutes.
    • Hold your stand-up at the same time every day.
    • Only discuss the work for the day ahead.
    • If the team is distributed, use video conferencing with cameras on.
    • Long discussions should happen after the event.
    • As the stand-up encourages progress, everyone should provide an update, and everyone should feel accountable.

    3. Sprint Review

    The Sprint Review is the time to showcase the team’s completed work and gather feedback from stakeholders. A variety of attendees from outside the team offer valuable insights from different viewpoints. This event also helps build trust with both external and internal stakeholders.

    StructureAttendeesTimingDurationAgile frameworkThe Scrum Master takes on the logistics of event preparation.   The Product Owner should ask stakeholders questions to gather as much feedback as possible. They should also answer any of their stakeholder’s questions.Development Team, Scrum Master, Product Owner. Optionally, management, customers, developers, and other stakeholders At the end of the sprintOne hour per week of the sprint. In a one-week sprint, the Sprint Review lasts one hour.Scrum and Kanban.   Kanban teams do these reviews after the team milestones, not sprints.

    Outcomes

    After this ceremony, the Product Owner might need to adjust or add to the product backlog. They might also release product functionality if it's already complete.

    Top tips

    • Schedule in time to rehearse before the meeting to help your team present with confidence, especially if external stakeholders are coming along.
    • Don’t showcase incomplete work. Review your Sprint Planning and the original criteria if you’re not sure whether the work is complete.
    • Besides product functionality, focus on user experience, customer value, and the delivered business value.
    • Consider ways you can introduce a celebratory feel to acknowledge the team’s effort.

    4. Sprint Retrospective

    In this final scrum ceremony in the sequence, you look back on the work you’ve just done and identify ways to do things better next time. The Sprint Retrospective is a tool for risk mitigation in future sprints.

    StructureAttendeesTimingDurationAgile frameworkThe teams discuss what went well throughout the sprint and what went wrong.   The Scrum Master should encourage the Development Team to speak up and share not only facts but also their feelings.   The goal is to gather rapid feedback for continuous improvement in terms of process.  It’s also an opportunity to emphasize good practices that the team adopted and should repeat.Development Team, Scrum Master, Product Owner (optional)At the end of the sprint45 minutes per sprint weekScrum and Kanban (occasionally)

    Outcomes

    After this session, the team should clearly understand the problems and the wins that happened throughout the iteration. Together, the group comes up with solutions and an action plan to prevent and identify process problems in the next sprint.

    Top tips

    • Focus on both facts and feelings
    • Gather information that helps you focus on continuous improvement – this might include tools and relationships
    • Be honest and encourage ideas that solve process-related problems
    • Even if everything went well, have this meeting – retrospectives provide ongoing guidance for the next sprint.

    "With the speed of change expected to continue, the need has never been greater for an operating model that keep up." - McKinsey

    Agile lessons to live by

    As a team of experienced agile practitioners, we’ve picked up some key learnings about what it takes to get the most out of your agile ceremonies and create the foundations of a truly agile organization.

    Here are our top tips to make your ceremonies a success:

    • Be deliberately present - During the ceremonies, remember to take moments to pause and remind yourself of why you’re there. Show others that you’re present by giving them full attention and using your body language. In a remote setting, angle your camera as though you’re sitting across from them, look into the lens regularly, and use a distraction-free background.
    • Practice active listening - Think about what the person is saying, who they are, and what they need from you. Are they looking for a soundboard, do they need your help or opinion, or are they looking for an emotional connection?
    • Understand motives - Understand the motivations of your teammates before speaking. Consider why they should care about what you’re saying by connecting your message with their own motivations. Provide context where possible to let them know why your message matters.
    • Be flexible - It's important to remember that there is not a one size fits all approach to agile ways of working. What works for one team may not work for another, so you need to experiment to find out what works then tailor processes to suit your team's needs.
    • Create cultural alignment - The best processes in the world won’t deliver what you need if you don’t have the culture to support their delivery. Agile ceremonies need to be supported by a culture where people are actively engaged, confident to raise issues, and value continuous improvement.

    Agile ceremonies lead to better results

    While it can take time for teams new to agile to adjust to agile ceremonies, they are worth the effort. By providing a clear structure and achievable outcomes, they help align everyone on the product, communication, and priorities.

    The result? Agile teams that provide better quality products faster – and deliver real business outcomes.

    Wherever your organization is on your agile journey, it’s worth keeping in mind that each team and each suite of products are different, so there’s no standard recipe for success. The good news is that by working within the continuous improvement mindset the agile framework promotes; you too can iterate and improve your agile ceremonies over time.

    Ready to get started?

    Easy Agile TeamRhythm supports your team's agile practices in Jira. Supporting your team from planning right through to retrospective, TeamRhythm helps you and your team work better together to deliver value to your customers.

    Features include:

    • Agile sprint and version planning tool - Planning is quick and easy when you create and estimate issues on the story map. View your work under initiatives and epics, and see swimlane stats at a glance, ensuring team capacity is filled but not overcommitted
    • Agile story mapping - Map the customer journey using initiatives, epics, and stories alongside your agile Jira boards. Quickly and easily add new or existing stories inside the story map. Drag and drop to prioritize by value to the customer.
    • Product backlog refinement - Escape your flat backlog and view your work on the story map matrix. Drag and drop issues to prioritize or schedule. Quickly update story summaries and story point estimates with inline editing for a better backlog.
    • Team retrospectives - Celebrate success, gain insights, and share learnings with team retrospective boards for scrum and kanban, encouraging collaboration and transparency, so you and your team are continuously improving.